IOC and PV Inventory

330 IOCs and 415 000 process variables. This chapter shows where they come from and why the boundaries are drawn where they are.

The granularity decision

The recurring argument, decided here: one IOC per device group or per crate, biased fine-grained.

  Fine-grained (chosen) Coarse-grained
Failure domain One device group A whole subsystem
Restart cost Seconds, one device group offline Disruptive, subsystem-wide
Ownership Obvious Shared, therefore nobody’s
Cross-device logic CA links — asynchronous, can disconnect DB links — synchronous, guaranteed ordering
Process count 330 to deploy and monitor ~30
Database size Small, comprehensible Large; wide lock sets

The rule applied: draw IOC boundaries where you are willing to lose everything inside them at once.

Fine-grained is only affordable because deployment is containerised — 330 processes is an inventory problem, and inventory problems are solved by tooling. In 2005 this decision would have gone the other way, and many operating facilities still live with coarse IOCs decided under exactly that constraint.

Where fine-grained was overridden: records that must interlock reliably live in one IOC. Cell 5’s vacuum gauges, its ion pumps and its valve-status readbacks are one IOC, because the summary logic that drives the cell’s vacuum-OK indication must be synchronous and must not depend on a CA link staying connected. Splitting them per-device would have been dogma winning over engineering.

IOC inventory

Accelerator: 210 IOCs

Group Count Scope of one IOC
Linac and gun 12 Gun, 2 modulators, 3 RF, 2 magnet, 2 vacuum, 2 diagnostics
LTB transfer line 4 Magnets, vacuum, diagnostics, screens
Booster 20 4 magnet PS, 2 RF, 4 vacuum, 6 diagnostics, 2 kickers, 2 timing
BTS transfer line 4 As LTB
SR magnet supplies 40 Two per cell — one for quads/sextupoles, one for correctors
SR vacuum 20 One per cell: gauges, ion pumps, turbos, valve status
SR diagnostics 26 One BPM/loss IOC per cell (20), plus 6 central (DCCT, tune, streak, bunch-by-bunch)
SR RF 6 2 cavity/LLRF, 2 SSA, 1 harmonic cavities, 1 supervisory
Insertion devices 15 One per ID: motion, cryogenics, feed-forward
Front ends 20 One per beamline front end: slits, XBPM, shutter status, vacuum
Timing 4 EVG, event distribution, timestamp diagnostics
Fast orbit feedback 4 Configuration and diagnostics interface to the FPGA system
MPS / PPS / radiation interface 6 Read-only status from the protection systems
Cryogenics and utilities 14 Water circuits, HVAC, LN₂, He plant — mostly OPC UA to PLCs
Machine-wide soft IOCs 15 Orbit aggregation, unit conversion, mode logic, summaries, physics support
Subtotal 210  

Beamlines: 100 IOCs

Five per beamline, at full build-out (20 beamlines):

Per-beamline IOC Scope
Optics motion Monochromator, mirrors, slits — motor plus pseudo-motors
Optics services Beamline vacuum, cooling, filters, attenuators
End-station motion Sample stages, diffractometer, positioners
Detector areaDetector — one per primary detector
Sample environment Cryostreams, furnaces, gas rigs, whatever the science needs

Central and infrastructure: 20 IOCs

Group Count Scope
Network and PDU monitoring 4 SNMP to switches, PDUs
UPS monitoring 2  
Environmental 2 Rack and gallery temperature, humidity
Facility summary / aggregation 6 Machine mode, facility-wide summaries, status for beamlines
Site and weather 1 Yes, really — ground temperature correlates with orbit drift
Test stands 5 Magnet, RF, vacuum and detector test stands, plus a full simulation IOC set
Subtotal 20  

Total: 330 IOCs

PV inventory

Accelerator: 265 000 PVs

Subsystem Devices PVs each Total
Magnet power supplies ≈900 supplies ≈80 71 000
Vacuum 600 devices ≈40 24 000
Diagnostics 180 BPMs @150, 120 BLMs @30, other 40 600
RF 12 000
Insertion devices 15 ≈800 12 000
Front ends 20 ≈400 8 000
Timing 60 EVRs + EVG 6 000
Fast orbit feedback 8 000
MPS / PPS / radiation status 12 000
Cryogenics and utilities 25 000
Linac, booster, transfer lines 30 000
IOC health and soft/aggregation PVs 210 IOCs 16 400
Subtotal     265 000

Beamlines: 130 000 PVs

20 beamlines × ≈6 500 PVs each. A detector IOC alone contributes 2 000–4 000 (areaDetector’s plugin chain is PV-rich), motion another 1 500, and the rest is optics, vacuum and sample environment. See the beamline chapter.

Central and infrastructure: 20 000 PVs

Network gear, PDUs, UPSs, environmental, facility summaries, gateway statistics, test stands.

Total: 415 000 PVs

What the numbers imply

Magnet supplies are the largest single block. 71 000 PVs, 17% of the facility, from ≈900 devices. That is what “80 PVs per power supply” looks like at scale — setpoint, readback, limits, status bits, interlock reflections, temperatures, firmware version, statistics. The lesson: a per-device PV count you consider reasonable, multiplied by device count, is the number that determines your archiver sizing and your naming budget. Decide it deliberately.

Two hundred and ten accelerator IOCs need generated configuration. Nobody hand-writes 40 magnet IOCs. Each is instantiated from a template plus substitutions generated from the device database, and its st.cmd is generated by ibek from a YAML description. The per-cell IOCs differ only in their cell number and their device list.

Sixteen thousand IOC-health PVs justify their own tooling. 210 IOCs × ~60 iocStats PVs is not noise — it’s the data behind the control-system health dashboard, and it gets its own branch in the alarm tree.

Host allocation

330 IOCs do not mean 330 machines.

Tier Hosts What runs there
Accelerator IOC servers 12 Most of the 210 accelerator IOCs, as containers with host networking
Embedded / crate controllers ~35 MTCA and VME controllers for diagnostics, timing and fast systems — where hardware forces locality
Beamline IOC servers 20 One per beamline, hosting its 5 IOCs
Detector servers 20 One per beamline, on the detector network, sized for data rate
Central services See service deployment  

Soft IOCs are packed onto shared servers; hard IOCs live where the hardware is. The split follows a simple rule: an IOC runs as close to its hardware as the bus requires, and no closer. A serial device reached through a serial-to-Ethernet converter needs no locality at all, which is why most HLS IOCs are soft IOCs in a rack room.

Naming IOCs

Distinct from PV naming, and it matters because the IOC name appears in iocStats PVs, ChannelFinder properties, log files, container names and procServ ports.

<sec>-<area>-<class>-ioc-<nn>

sr-c05-va-ioc-01        cell 5 vacuum
sr-c05-ps-ioc-01        cell 5 quad/sextupole supplies
sr-c05-ps-ioc-02        cell 5 correctors
sr-s07-id-ioc-01        straight 7 insertion device
bl07-op-ioc-01          beamline 7 optics motion
hls-cf-sum-ioc-01       facility summaries

Lower case, because these are hostnames, container names and log filenames. Console ports are allocated systematically from a documented table — ad-hoc procServ ports collide eventually, and the collision appears as an IOC that mysteriously won’t start.

Keeping the inventory honest

Generated, not maintained. recsync reports every IOC’s record list into ChannelFinder; iocStats reports its health. The inventory is a ChannelFinder query, so it cannot drift from reality.

A hand-maintained IOC list is wrong within a month, and its wrongness is invisible — which is worse than having no list, because people trust it.